The planned project concerns improving the availability and quality of comprehensive and highly specialised health services in the region, by extending by a three-story wing together with the necessary infrastructure of the Ceynov Specialist Hospital in Wejherowo belonging to the Hospital of Pomorskie Sp. z o.o. in Gdynia. At the level of the ground floor, there are 2 hospital wards, including treatment rooms and medical equipment: Cardiothoracic (28 beds) and Cardiology and Intervention Angiology (40 beds).On the floor, an operating unit consisting of 7 operating rooms with the purchase of equipment was designed. It'll touch the central sterilisation, blood bank along with pathology and autopsy. The estimated number of surgical procedures and cardiological procedures in the period 2022-2035 in the infrastructure is 172,601, including 68,627 operations in the operating block (about 65 %) will concern civilisation diseases.The total net area of the operating block building is 7560 m².