Before the project is the construction of a new, expansion and reconstruction of the existing infr. infr. collective transport consisting of a transport point, including: parking systems such as “Park and Drive”, “Park and Drive”, construction, expansion and reconstruction of infr. linear bicycle transport for access to integration nodes. It is planned to build and/or rebuild bicycle paths, walkways, sidewalks, tranquillisers, bicycle infringers in Malbork; construction of the Malbork-Tragamin on foot and bicycle line in Malbork and Kościeleczki-Tralewo-Nowy Pond in the Nowy Staw building – enabling access to the integr node. (PKP station in Malbork) and stop with integrated. Malbork-Kaldowo. An information-educated campaign is planned for the promotion of collective and cycling transport. The aim of the project is to increase the number of public transport passengers in the Malbork-Sztum area thanks to a well-developed and effective integrated public collective transport on district and regional scale.