Kohesio: discover EU projects in your region

project info
Start date: 21 April 2017
End date: 31 August 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 612 952,55 €
EU contribution: 521 009,67 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Śląskiego, Urząd Marszałkowski Województwa Śląskiego
intervention field
European Commission Topic

Assembly of renewable energy sources in Mierzęcice commune

The subject of the project is the design, delivery and assembly of photovoltaic micro-installations in 114 residential buildings and 9 public buildings and solar collector installations in 76 residential buildings. In residential buildings there are 2 types of photovoltaic installations with a power of 2 kW and 3 kW and 4 types of solar collector sets. The main components of photovoltaic installations are: panels of 8 or 12 pcs, inverter and control-measurement module respectively. The solar system will consist of 2 to 5 collectors with equipment, and its task will be to support heating of water. In publ. utility buildings, photovoltaic installations ranging from 2 to 20 kW were designed. Each photovoltaic installation will operate in the on- grid system, the priority being to meet the current demand for electricity, and surplus electricity will be transferred to the power grid.

Flag of Poland  Sosnowiecki, Poland