The project provides for a decarbonisation of transport in Piekary Śl by building a transfer centre, a park parking lot connected to the network of cycle paths with a parking lot like Park &Bike. The construction of the necessary transport infrastructure (including interchange centre and bicycle roads) and the use of ecological means of transport (bicycles) has a huge impact on increasing the attractiveness of public transport in Piekary Śląskie Municipality and will reduce CO2 emissions and other pollutants. La built integrated interchange nodes – 1 pcs, Number of built facilities "park and drive" – 1 pcs, LBA built facilities "Bike&Ride“– 1 pcs, Long roads for bicycles – 10.3 km, LBA parking stations in built facilities”Bike&Ride" – 20. Result indicators: La cars using posto places in the construction of “park and drive” facilities – 17 136 pcs. LBA parking places in built P&R 73 pcs