The project consists of the construction and modernisation of the water supply network with a total length of approx. 1.5035 km, construction and modernisation of sanitary sewage system with a length of approx. 1.335 km, construction of 1 sewage pumping plants and reconstruction of road surfaces in Przechlebi – ul. Pond, hive. Mikulczycka, ul. Green, hive. Polna, ul. School, st. Forests and hives. It’s a pine tree. However, only 4 streets are indicated in the title, and in fact the investment will be carried out on 7 streets, as the street. School, st. Forests and hives. Pine tree bordering the street. The joint, and the scope of works to be performed on them is small – it will be from a few meters to several meters of sewage/water supply. Initially, the investment was planned for 4 streets, while at the stage of preparation of technical documentation it turned out that construction works must also be carried out on 3 additional streets – hence all 7 streets were included in technical documentation.