Kohesio: discover EU projects in your region

project info
Start date: 27 October 2016
End date: 31 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 648 896,25 €
EU contribution: 551 561,81 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Śląskiego, Urząd Marszałkowski Województwa Śląskiego

‘Comprehensive disposal of waste containing asbestos in a building on ul. Kilińskiego 4-4a in Sosnowiec”

The project aims to remove asbestos from a residential building located at Kilińskiego Street 4-4a. The object of the project is the dismantling of asbestos-cement panels (acecol type) from the building, their loading, transport and disposal of hazardous waste at the landfill. Currently, the total area of asbestos-cement plates is 5711.16 m², which gives a total weight of 62822.76 kg, or 62.82276 Mg. In addition to operations related to the disposal of asbestos waste, the project also provides for: restoration of the building before dismantling, investor supervision, project documentation, preparation of analyses for the project and application (including advice) and promotion. Implementation of the project will be carried out by the selected contractor by means of a tender request, authorised in this respect. The building covered by the project will meet the requirements of Poland’s commitment to the EU, declaring that the state should be cleansed of asbestos and products containing it by 2032.

Flag of Poland  Sosnowiecki, Poland