The object of the project is the construction of the last section of the N-S route, which aims to establish an uncollid connection of the Road Medium Route with the A4 motorway. This section includes the construction of the N-S route 1670 m from the street. Kokota to connect to the A4 motorway in the “Wirek” junction. The project included the construction of: — engineering facilities – elements of the drainage system – pavements and cycle paths – road safety elements such as: protective barriers, horizontal and vertical markings – illumination along the whole route – culverts integrated into the transition for small animals. The aim of the project is to: — increasing the availability of DTŚ and the A4 motorway – a collision-free connection between the DTŚ and the A4 motorway – increasing the capacity of DW 925 in the direction BC – pd. — increasing traffic safety on ul. 1 May – shortening the journey time between BC and south of the city districts and street. 1 May – increase the investment attractiveness of areas located in the street. 1 May and N-S