“The project concerns a deep modernisation of energy. 11 gm.objects used.publ. fulfilling important social functions in the areas of: culture, education, safety publ.(rural lighting, schools, OSP guards). The scope includes warming, window exchange, doors, LED lighting, remodeling of heating systems and RES installation. Estimated cost of the task PLN 3.94 million.The condition of the objects is bad due to the value of the gran. sympathetic heat transfers of building partitions, inefficient functions. heat sources and installations. Poor condition of the techn. object.,used carpentry, do not meet the requirements of thermal insulation and efficient gosp. energet. objects, which is associated with significant energy efficiency. and increase costs.The project meets the objectives of axis 3 and section.3.3 Improving effect. energ. with the use of.RES. There will be a reduction of CO2 emissions by 63.93 %.An additional effect of the project is the improvement of the operating conditions of the objects, which due to the high heating costs limited their cult activity during the winter.The design work of the thermal modernisation has ended. The project is connected with the revitalisation department and has been included in the threshold. Revitalisation, as part of project.podst.No. 6. is in line with Objective 2 – to create prosdr. publ. and actions 2.1-Protection of Wednesday and low emissions implication.One object covered by the project is in the revitalisation area, taking into account the specificities of pollut migration, limiting emissions in adjacent areas has an impact on the achievement of the revitalisation objectives. Wsk.prod: Number ofmod.energ.bud 11,Pow.Use..4914.37 m²,Number of heat sources 3 pcs.,Number of buildings per.e.el. from RES 1 pcs.