The main objective of the project is to increase the number of people using the sewage treatment system in the area of the Fuel agglomeration. As a result of the investment, 2780 inhabitants will be able to connect to sanitary sewers. Project activities include the construction of sanitary sewage systems in the towns of Makoszyn, Belno, Lechów, Górki Napakowskie, 30.94 km long (Bieliny) and in Lechówek with a length of 4.43 km (Lagów commune). A total of 35.37 km of network. Purchase and implementation of SCAD and GIS. The implementation of the project will contribute to: 1. solutions to the problems of wastewater management in the area of the Fuel agglomeration, 2. protection of surface and groundwater against pollution (decommissioning of wastewater tanks and illegal direct discharges of waste water into the receiver), 3. protection of natural valuables located in the agglomeration and commune area, 4. improvement of the aesthetic value of the region, 5. improvement of living conditions of local residents (increasing access to sanitary sewage systems), 6. the equalisation of the diversity of the area and the area between Indicators: 1. Number of additional persons benefiting from improved waste water treatment – 2780 2. Length of built sanitary sewage system – 35.37 km. The objectives are in line with the specific objectives set for the 4 Priority Axis 2014 to 2020 and the specific objectives defined for Action 4.3. Water and sewage management. Increased proportion of the population using a waste water treatment system in accordance with the Urban Waste Water Directive. The project shall be compatible with: 1. ACPOŚK 2017 and Master Plan for the implementation of Council Directive 91/271/EEC on urban waste water treatment, 2. Environmental Protection Programme for Świętokrzyskie Voivodeship.