Construction of a sewage treatment plant in Sędziszów with a daily average capacity of 1500 m3 / d and a load of sewage subject to improved treatment 11097 RLM in Sędziszów, Sędziszów commune, Jędrzejów poviat. in the SBR system, located on the premises of the existing sewage treatment plant, the objects of which will ultimately be decommissioned and demolished. sewage pumping station with a measuring chamber The communication infrastructure will be expanded, inter-facility pipelines reconstructed, water supply connection constructed. After the expansion, the sewage treatment plant facilities will occupy an area of approximately 1.8 ha. , Szałas, Tarnawa, and from the Słupia J-ska commune: Słupia J-ska, Rawka, Wywła, Nowa Wieś. and then discharged to the wastewater retention tank and dosed to biological reactors after averaging and refreshing. Construction of a sanitary sewage system in Sędziszów Main sanitary sewers are designed to the boundaries of the property. Due to the terrain, the planned sewage system will be gravity-discharge with pumping stations. The project complies with the detailed objective of the priority axis. measures 4.3 Water and sewage management - Increased percentage of the population using the sewage treatment system compliant with the municipal sewage directive Length of sanitary sewage system built 10.7 km Number of municipal sewage treatment plants built 1 pc Number of additional people using improved sewage treatment RLM1320