The object of the project is the construction of: sanitary sewage system and water supply system in Nowa Słupia commune. The planned investment is located in the Rudki agglomeration and Nowa Słupia agglomeration. The main objective of the project is “Development of the infrastructure and sewage and sewage network of Nowa Słupia commune and increase the comfort of life of residents”. The project’s assumptions are in line with the objectives of RPOWŚ for 2014-2020, Investment Pr. 6b, Measure 4.3. All the work related to the implementation of the project in kind includes the following investment elements: 1.Construction of sanitary sewerage gravitational-pressure 2.Construction of water supply network. Thanks to the project, it will be possible to achieve an ecological effect in the form of ordering waste water management by draining sanitary waste water treatment plants in an organised and compliant manner, maximising the ecological effects of obtaining as many connections to the sewage system as possible, improving the sanitary status of the city by cutting off any existing sanitary outflows to watercourses, surface water and road ditches, and by eliminating shambs. Output indicators: 1. “Length of built sanitary sewage system” -30.18 km; 2. “Length of built water supply network” -1,47 km; 3. “Length of reconstructed water supply network” -3,90 km; Result indicators: 1. ‘Number of additional persons benefiting from improved waste water treatment (CI 19) -3004 RLM; 2. ‘Number of additional persons benefiting from improved water supply (CI 18) -64 persons. The implementation of the project will contribute to the protection of the environment by preventing the possibility of diverting pollution to water and soil and will swim to improve the quality of life of the inhabitants of the region.