Kohesio: discover EU projects in your region

project info
Start date: 27 June 2016
End date: 31 March 2017
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 012 710,96 €
EU contribution: 860 804,32 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

“Expansion of voivodship road No. 762 on sections:/Expansion of the Voivodeship Road No. 762 on the section from the border of Gm. Chęciny i.e. km 25+ 198 to the bridge facility on the river Łososina (Wierna River) in Bocheniec, i.e. km 27 + 138 length approx. 2 km/’

The project is at the stage of implementation. The project includes construction works: —development of the road C. G at 1,65 km. The structure of the gr.42 cm pavement ensures a load capacity of 115 kN/axis – construction of drainage of the road with open ditches and a rainy channel – construction of a walking-bike. length approx.1,59km. Konstr. nave with abrasive concrete asphalt. gr. 4 cm will ensure greater durability and greater safety and comfort of driving. — construction of pavement length 0,17 km and platforms with cube bet. gr.8cm. — construction of 2 bays of autob. with shelters, publ downhills and downhills to fields, properties, frame culverts with shelves for small animals, pipe culverts under the exits – construction of road lighting and control and weighing places of vehicles and parking places – refurbishment of the network electroennerget. nN, teletech.i network rain. length 0.52 km – marking level. and vertical. parking lot for bicycles with stands, tables and benches, baskets, information boards. Output indicators: length of reconstructed voivodship road – 1.65 km Results indicators: capacity of built/rebuilt road 115 kN/axis The project also includes: management and supervision of the implementation (engineering, archaeological, geodetic, geological, environmental, laboratory), copyright supervision, promotion, updating of the feasibility study, regulation of the legal status (land settlement, compensation, fees and others). Through the implementation of the above-mentioned project, the objectives of the abovementioned project will be achieved.5.as of the RPOWS for the period 2014-2020 i.e. increased transport accessibility and security of the regional road network complementary to TEN-T network under investment priority 7b – increasing regional mobility by combining secondary and tertiary nodes with TEN-T infrastructure, including multimedia nodes, (measures 5.1 Road infrastructure), as DW762 connects directly with DW762.

Flag of Poland  Sandomiersko-jędrzejowski, Poland