Project at the implementation stage. Includes: expansion of DW755 Kla. G from km 12 + 124.5 to km 16 + 247.0 h. 4.12 km, construction of the Ćmielowa bypass-road. I've got it. 5.1 km, design, construction and equipment of the road circuit. Scope of expansion works DW755: reconstruction of the building with extensions of 54 cm with abrasive layer from the mass of SMA gr. 4 cm, bus bays, pavements and exits to the property from paving stone gr. 8 cm, bicycle path with bitumen, downhills to fields, drainage ditches, culverts under bays, downhills, rain drainage, construction of street lighting, including reconstruction of collisions telecommunication, water supply, crossing for type A animals, reconstruction of culverts with a complex D transition, traffic safety equipment, marking. The scope of the construction of the Ćmielowa ring road includes: construction of a section of the road C. All right. 5.09 km, construction of two junctions in the form of a roundabout, on foot – bicycle, construction of drainage of the road, regulation of existing watercourses, construction of engineering facilities on the river Ćmielówka (bridge), Trębanówka, Wojciechówka, water drainage, construction of culverts and passages for animals, construction of a viaduct, reconstruction of existing intersections, construction of service roads to fields, construction and reconstruction of existing exits, reconstruction of the collision with the gas network, electricity, NN, The development of a construction and execution project and the construction of a road service base for the needs of the road circuit together with equipment includes the development of a construction and implementation of the base in accordance with the assumptions of the Functional and Useful Programme with obtaining administrative decisions, building the base and its equipment.