Project at the implementation stage. DW754 runs through areas of buildings. and non-builds. demolition, relocation of chapels, crosses, tree cuttings, strong. scarf and bottom of rows. Stone at ditch inlets, expansion of DW 754 class, carrier.115kN/axis from km 1 + 912 to 29 + 269 long. 27.357 km-enlargement, reinforcement of the nave structure- in sheet. gr.4 cm with SMA11, -w-w-w-w-w-w-wo gr. 6 cm with AC16W, -w-wo levelling. (zal. from the load capacity of the ground)-8 cm with AC16W, substructure. Just.gr 8 cm with AC22P, correction of the level and geometry of arches, restructure. cross. with roads of support, small roundabout, extra. walking lanes, drainage. 5 cm from the weight of AC11W), autob. and standstill. (Nav. with knuckles. 17-19 cm or cubes bet. Wibropras.gr.8cm), service roads and subordinates.(naw. from the mass of AC8S gr. 4 cm, w-wa related. gr. 6-8 cm with mass AC16W), reconstruction of individual descents. and public slides, staircases of resistance walls, can. rain lighting. road, remodeling line eletroenerget, teletechnics, hotline., water., gas In addition: promotion, investor and copyright supervision, audit, land. The project is consistent with the objective of action 5.1 Road infrastructure of the Świętokrzyskie Voivodship Regional Operational Programme 2014-2020 – increased transport accessibility and improvement of the regional security of the complementary TEN-T network under the Investment Priority 7b- to increase regional mobility by combining secondary and third-order nodes with TEN-T infrastructure, including multimodal nodes, as there will be section DW 754 by nodes.