Kohesio: discover EU projects in your region

project info
Start date: 28 April 2017
End date: 31 May 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 9 471 340,22 €
EU contribution: 8 050 639,18 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Extension of the Voivodeship Road No. 766 on the section of Pińczów-Węchadłów to the intersection with DW 768 length approx. 27,0 km/Construction of the Pińczów ring road/

Project implemented in sist. design-build. According to the proger. Funkc.-Use includes the design and construction of the Pińczów ring road for approx.4.65 km (connections DW766 km. approx.24+ 530 and DW767 in km 2+ 462), expansion of DW766 and DW767 total length approx. 3.75 km. and authorship. Bypass Pińczów – road kl.G., load.naw. 115 kN/axis, motor vehicle KR4, single-mobile wide. 7.0 m-two lanes (2x3,5m) with asphalt band.2x0.5m, hardened side 2x1.25m. Roads are being designed. (including with use as a bicycle), redevelopment of intersections of communes roads., county and local with DW766,767 and bypass, parking space. for cars. persons. and weight. There are also planned passages for animals, culverts for amphibians, road culverts., bays of cars., shelter stops., sidewalks, pedestrian-bike lines, publ. and individual descents, drainage of surface roads and rain canals., traffic-free facilities, street lighting, plant planting. In addition, it is necessary to reconstruct the facilities and appliances that conflict with the investment: waterworks, kan.sanit., rain. gas network, teletech. energet.WN, SN and NN, lighting. and others. The requirements for the structure of the surface are described in the PFU. The detailed material scope and technology will be specified in the design documentation being developed. Deadline for completion of documentation-31.12.2017, obtaining ZRID decision – 31.03.2018. The project shall include: construction works and investment supervision, authorship, promotion, document, land purchase, project management costs. The project is compatible with the objective of action 5.1 Road infrastructure of the Regional Operational Programme Woj. Świętokrzyskie for the period 2014-2020 – Increased transport accessibility and improved security of the regional network complementary to the TEN-T network under the Investment Priority. 7b-increasing regional mobility by linking secondary and tertiary nodes with TEN-T infrastructure, including multimedia nodes, as a new section of the voivodships will be created. — bypass, long-distance. 4.65 miles by lift. 115kN/axis and reconstructed section of the road long, approx. 3,75 km with lifting capacity. 115kN/axis.

Flag of Poland  Sandomiersko-jędrzejowski, Poland