Project at the implementation stage – design and build in the system. Located in the south-east part of the Świętokrzyskie Voivodeship during the DW768. The Jędrzejów ring road long 2.5 km begins in km about 199 + 200 DK78 and runs in a new trail (outside the borders of M. Jędrzejów) joins the existing DW768 in km approx.2+ 500. Extension of DW768 length of approx.3.0 km from km approx.2+ 500 until intersection with DP0170T in km approx.5+ 500. The substantive scope has been adopted on the subst. IT’S A PFU. It shall include: demolition works, demolition, earthworks, road works, construction and reconstruction of engineering facilities, crossings, bus bays, sidewalks, bicycle paths, construction of culverts, exits, dehydration of roads and bypasses, reconstruction of junctions, exits, access roads, reconstruction of existing technical infrastructure (water pipelines, gas network, road lighting, power grid, telecommunications). Techn parameters established in PFU: it’s techn class. G, load capacity of 115kN/axis, KR4 road with two lanes wide. 2x3.50 m with bitumen bands. 2x0.5m, wide side. 2x1.25 m (ground, optionally hardened). Surface design: abrasive layer made of SMA11-5 cm, binding to bet. asf. WSM-14 cm, base base with bet. asf. AC16P-5 cm, auxiliary support with crushed stabilisation. moch. gr.20cm, primer stabilisation. C3/4-20 cm cement. Details of the surface structure and the scope of the works will be determined after the design documentation has been drawn up. The project is in line with the specific objective of Measure 5.1 Road infrastructure of the Świętokrzyskie Voivodship Regional Operational Programme 2014-2020 – increased transport accessibility and improved security of the TEN-T network as part of the investment priority 7b – increasing regional mobility by combining secondary and tertiary nodes with TEN-T infrastructure, including multimodal nodes, as there will be a Jędrzejowa bypass about 115 km long.