project info
Start date: 28 September 2016
End date: 31 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 5 091 775,65 €
EU contribution: 4 328 009,30 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Extension of the provincial road No. 764 Kielce – Staszów along with the construction of bypasses of Suków, Daleszyce, Ociesęki, bypass system Staszowa; all right. 45 km/Broadway system m. Staszów dr.woj No. 764/

Project implemented in the design-build system. ORW. Staszowa zloł. wwoj. świętok. pow. Staszów, gm. Staszów outside the centre of Staszów on his afternoon.-zach. Beginning of the circuit.-rondo at DW765 km approx. 0 + 000, end on DW764 in km approx. 4 + 870. The length of the planned circuit is 4.87 km. Includes the design and execution of construction works as well as copyright supervision. Adopted according to PFU param. tech. and planned scope of works: 115 KN/axle, KR4, single lanes, two lanes with a width of 3.5 m each, safety bands.2x0.5m, bike path, pavement, sideways reinforced crumbles. Reinforce the ground floor, construction of new surfaces, construction and alteration of engineering objects, intersections with dr. voivodship, communes and local districts, walking, cycling, downhills, culverts, energy-intensive steel barriers, signs. horizontal, vertical, reflective elements, dehydration of the road, passage of collision with istn. infrast. (teletechn., energet., waterworks, can. sanit., rain., gas, lighting, etc.), tree cutting and planting, demolition robots. The specific scope of works and the technology of the adopted design solutions will be determined after the construction project has been developed. As part of the project plans, there are: investment supervision, promotion, buy-out, management costs. Planned product indicators: length of built voivodeship roads 4.87 km. Result indicators: capacity of built/rebuilt road 115 KN/axle. Param. techn. basic objects and works predict. to be carried out as part of the abovementioned investment are established in the project. Through the implementation of the abovementioned project, the objectives of detail 5. RPOWS 2014-2020 axes will be achieved, i.e. increase the availability of transp. and improve safety. region. of the road network. complete TEN-T network as part of investment priority 7b-increase the region’s mobility by combining secondary and tertiary nodes with TEN-T infrastructure, including with multimedia nodes (measures 5.1 Infrastructure). 4,87 km and load capacity 115 KN/axle providing improved connection to DK73 and DK79.

Flag of Poland  Sandomiersko-jędrzejowski, Poland