Start date: 1 February 2017
End date: 30 June 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 7 395 087,73 €
EU contribution: 6 285 824,57 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Extension of Voivodeship Road No. 973 on pc. Busko – Zdrój – Nowy Korczyn – Borusowa with the construction of a bridge crossing to the river. Nida and RZ. Vistula/Construction of the bypass of Zbludowice/

Project at the implementation stage-in the system design and build, located in the southern part of Woj. Swietokrzyski – Busko-Zdrój commune. Bypass M. Zbludowice long. 6.7 km will start at the junction of DW973 with DP0084T and DP0085T (km approx. 3 + 306) and its inclusion in km approx. 9 + 900. The bypass is designed as a one-way road. GP, with two lanes wide. 2x3.50m, bitum bands. wide. 2x0.5m, with hardened flanks wide. 2x1.5m, with intersections (including 2 type of roundabout), objects inż. (bridges, road culverts, gossips, overpasses, passages for animals), with roads accessed. to the adjacent area, with surface drainage system and rain drainage system, with parking spaces., pavements, non-traffic devices (energy-intensive barriers, horizontal and vertical markings), lighting, reconstruction of collision with existing infrastr. techn. According to the Functional and Useful Programme, the circumference will be a GP road, load capacity of the surface and facilities 115kn/axle, KR4 traffic category. Construction of the bypass surface (in-abras. gr.4 cm with SMA 11S weight, binding gr.12 cm to AC 22 WMS, base of gr. 6 cm with AC 16P on the base with aggregate aggregates gr. 20 cm and the vertical aggregate stabilisation. cem. Rc3/4 – gr. approx. 15 cm; in the excavation additionally w-wa sand stabilisation. cem. gr.15 cm and stabilisation substrate. cem. gr.15cm). The detailed scope of the item. and development of constr. will be specified in project doc. The project also includes investor supervision, authorship, project doc., promotion, land purchase and management costs. Design according to the purpose of detail. Actions 5.1 Road infrastructure of the Świętokrzyskie Voivodship Regional Operational Programme 2014-2020 – increased transport accessibility and improved regional safety of the complementary TEN-T network under the Investment Priority 7b-Increasing regional mobility by combining secondary and tertiary nodes with TEN-T infrastructure, including multimodal nodes, as the Zbludowice bypass will be created. It’s 6,7 miles.

Flag of Poland  Sandomiersko-jędrzejowski, Poland