Kohesio: discover EU projects in your region

project info
Start date: 1 July 2017
End date: 31 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 873 037,31 €
EU contribution: 4 142 081,71 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Little Swietokrzyska Loop: DW 752 – Podgórze – Bodzentyn; all right. 2.5 km and DW 751 – Bodzentyn – Dąbrowa Dolna, length approx. 4.0 km

The project is located in the city. Bodzentyn, Gm. Bodzentyn, Kielce district, from Celina Podgórze to Bodzentin (DW 752) and from Bodzentyn to Dąbrowa Górna, which are part of “Little Pętla Świętokrzyska” and in msc Krajno, Gm. Górno. The object of the project is the construction of a small roundabout at the junction of DW 751 and 752 in the city centre. Bodzentyn with the reconstruction of the DW 752 to the distance from km 11 + 417.57 to a small roundabout and DW 751 for a small roundabout to km 18 + 813.31. In addition, the project will build a 2 cc. pavement in vengeance. The country and the bridge over DW 751 as ineligible expenditure. Technical parameters of reconstructed roads: Kl.G., KR3 traffic, widening the road. It’s 9 feet. Reinforcement of the surface structure by making bituminous overlay. The material scope of the reconstruction includes: construction of pavements, construction of exits to property and fields, dehydration, rain drainage, setting of elastic barriers, reinforcement of scars, marking. The project is in line with the specific objective of Action 5.1 Road Infrastructure RPOWŚ 2014-2020 – Increased transport accessibility and improved safety of the regional road network complementary to TEN-T as part of investment priority 7b – increasing regional mobility by linking secondary and tertiary nodes with the TEN-T infrastructure. DW 751 and DW 752 form a road system linking the north-east part of Świętokrzyskie voivodship. DW 751 runs through the districts: complaints, Kielce and Ostrowszeki connects the S7 Warszawa-Kraków expressway with DK 9 Radom-Rzeszów. DW 752, which runs through two counties: Kielce and Starachowice, it begins with the intersection with DK 74 in Górno, which is a road route connecting Sulejów near Piotrków Trybunalski and Kielce with Zamość and the border crossing with Ukraine in Zosin. As a result of the project, 5.04 km of voivodship roads with a capacity of 115 kN/axis will be rebuilt.

Flag of Poland  Kielecki, Poland