project info
Start date: 15 May 2017
End date: 30 September 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 736 519,01 €
EU contribution: 4 026 041,16 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego
beneficiary
European Commission Topic

Extension of ul. Łopuszniańska in Kielce

The subject of the project is the extension and reconstruction of ul. Łopuszniańska, which is a section of DW761 Kielce-Piekoszów and provides direct connection to the TEN-T network, at the administrative border of the city connecting a multi-level junction with the S7 expressway. The path of the road will run approximately along the existing trail, correcting the road axis by moving it in the north by approx. 1 m in relation to the existing axle. In the scope of the project, one of the plans is to rebuild the roadway by strengthening the structure of the road pavement and extending it to broader. 7 m (2x3,5m), reconstruction of the existing viaduct over railway line No. 568 of the Sitkówka Nowiny-Szczukowice relationship and construction of a foot and bicycle footbridge, remodeling of pavements, exits to plots, construction of a bicycle path, construction of rainwater sewage system, construction/refurbishment of street lighting, reconstruction or protection of existing underground and overhead infrastructure (SW Chapter. 1.3. Result – The carrying capacity of the built/rebuilt road: 115 kN/axle; Product – Length of reconstructed roads of voivodships: It’s 2,03 miles. The objective of the project is in line with PI 7b RPOWŚ 2014-2020 – Increasing regional mobility by combining secondary and tertiary nodes with TEN-T infrastructure, including multimodal nodes and with the specific objective OJ. 6.4 Increased safety of road users in the KOF area. The standard of road connections in KOF will be improved, ensuring safe and smooth operation of the regional transport corridor Piekoszów-Kielce (DW761). Increasing the technical and operational parameters of the road will increase driving comfort, improve and improve the movement of pedestrians and cyclists. The investment will increase the capacity and capacity of the modernised road, increase road safety; the construction of rainwater drainage and water treatment plant rain will improve environmental conditions. Project compatible with the ZIT KOF Strategy. Period of implementation: 2017-2019.

Flag of Poland  Kielecki, Poland