Kohesio: discover EU projects in your region

project info
Start date: 7 April 2017
End date: 20 August 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 561 737,17 €
EU contribution: 1 665 129,16 € (65%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Revitalisation of the Western and Lower Kamienna settlements in Skarżysko-Kamienna.

The areas covered by the project are neglected and separated from each other. The designation of the revitalisation area and the implementation of cumulative activities of the integration of the settlement. Transforming the area after a unit of troops into a recreational centre and building a common room will integrate residents and revitalise the area. Building surveillance, thermomode. School breaks and refurbishment of kindergarten will increase safety and improve aesthetics. The project continues to revitalise the Os. It is of strategic importance to the area. The applicant of the project is the Complain-Kamienna Municipality, partner of the Complaint District. The municipality will form on Os. Western recreational space building: skatepark, pumptrack, car parks with roads and infrastr. companion., building multifunction. (Wc, bicycle repair station, environmental lounge), playground, boulder complex, bike path. The municipality will renovate Kindergarten No. 1 with its surroundings. As part of the Urbanist-architect, the concept of the educational path was developed. The district will make the thermomode. School bursas on the Zesp. Eduk.-Wychow facilities with installation of photovoltaic panels. The activities will be carried out on the project documentation. The works will be supervised by investors. Promotional activities are foreseen. The tasks planned to be carried out in the GPR are consistent with the objective of detail. ROP WW 2014-2020 strengthened social-economic, physical and spatial development of urban areas, including post-industrial Axis priory. Urban Development, Investment Priority. 9b to support the physical, economic and social regeneration of poor communities in urban and rural areas and Measure 6.5 Urban and rural revitalisation All facilities (3) will have driveways for the disabled. The area of the revitalised areas is 3.57 ha, the number of supported infrastr. facilities is 3 pieces. All horizontal product indications and results are taken into account, 3 people will be employed.

Flag of Poland  Kielecki, Poland