Kohesio: discover EU projects in your region

project info
Start date: 1 August 2015
End date: 31 December 2017
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 261 891,73 €
EU contribution: 222 607,97 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Reconstruction and adaptation of the public utility building – primary school for residential, multifunctional housing – social housing in Hucisk, Stąporków Municipality

The main objective of the project, n. “Reconstruction and adaptation of a public utility building – primary school for residential, multifunctional – social housing in Hucisk, Stąporków Municipality” is to increase access to social premises. From the move. The diagnosis shows that Gm. Stąporków is struggling with a lack of social housing. In order to increase availability to the premises. socij. it is necessary to restructure and change the usage method. bud. after school podst. in Hucisku. The result will be 12 additional social premises. earmark for residents of the building. be in the fortunate difficult situation of the bellows. Bud. lies on 2 plots no. 484/5 and 483/4) in the Hucisku property of Gm. Reconstruction will consist of: forging window and door openings, walling of window openings and sound, demolition of partition walls, walling of new partition walls, installation of internal water and sewage systems, gravitational ventilation, electrical and central heating, thermo-modernisation and equipment. The location guarantees access to a complete package of services, e.g. clinic, common room, shop, church, school. Saturation of areas W=0.102. Access to community assistance. W IS EQUAL TO 0.0028. The project is covered by PR. Gm. has a valid lawsuit for construction. The project objective is in line with the objectives set out in the Axis SZOOP Pr.7 Action 7.3 Investment priority. 9a Goalszcz.2 Improved quality and wider accessibility of assistance and social inclusion facilities. In addition, Gm. belongs to the OSI – rural areas with the worst access to publ. services, i.e. realiz. project will affect the level playing field of areas with worse social conditions. Product Specification: L. reconstructed facilities in which socio-occupational activation services are carried out (pc.)-insk. Key.–1 pcs. Result indicators: Number of newly created jobs – 1 pieces; Employment growth in supported entities (other than enterprises) – 1 pieces.

Flag of Poland  Kielecki, Poland