The aim of the project is to improve the availability of infr. school. through modern. and infr. sport. designed to strengthen the fitness of students, equip. with modern equipment and materials. mat.-physical, geogr.-przyr. and biol.-chem. and modern. and locker room at PSP No. 4 in Ostrowiec St. This objective is consistent with the objective of the priority axis. 7 Efficient publ services and actions 7.4. Development of education and training. Renovation works.-modern. include replacement of interior and external doors, painting, renovation of the floor in the gym and its facilities; exchange: interior doors, floors, light and locker boxes in the locker room. The chem-biol and mat-physical studios will be fully equipped, geogr.-przyr.-equipped with, among others: tables and chairs for students. and teach, furniture, and modern teaching aids for teaching individual subjects and ICT tools, inter. boards, notebooks, 3 projectors, 3D printer, multifunk device. The hall of communes will also be equipped with a projector and instruments for activities physic. The use of modern. infr. and enrichment of the education process with modern teaching aids will contribute to improving the quality and efficiency of education. It will introduce differentiation and attractive forms of communication. The school is attended by deaf children, and taking into account the needs arising from their incomplete ones, will be purchased multim. Logopedic office supporting diagnosis, prevention and treatment of speech and language disorders. The need for change results directly from the Complex. The School Development Plan. The school is located in the area included in the revitalisation programme. When updating the Programme (in 2019), the project will be included in it as it will pursue the goals and objectives of the revitalisation threshold in terms of improving the social-educated sphere. As a result of the project, the potential of infr. support for childcare or infr. education will amount to 460 people, 1 infr. general education facility will be supported; the number of projects in which the cost of rational improvements for the part-partners has been financed will be 1.