It’s a project. 8 schools run by the Municipality of Ostrowiec St.: PSP 1, 3, 4, 5 (ZSiPP 3), 7, 9, 10, 14. As part of the project, the modernisation of PSP No. 14: modernised sports hall, replacement of floors, interior doors and lighting, construction of wall coverings made of ceramic tiles and driveways, painting ceilings, modernising bathrooms (e.g. adapting bathrooms to the needs of the disabled). Currently, there is also a gymnasium in the PSP No. 14 building, and the facility will eventually be used for the school’s subst. The project envisages the modernisation of the locker room at PSP 3: replacement of floors, illumination and boxes for cabinets, construction of a ceiling suspended. and a ramp for the disabled, warming of ceilings, painting of walls. The next task is to modernise 2 pitches at PSP 4, PSP 14, which will result in fenced multifunctional pitches. 26x44 m (handball, basketball, tennis, volleyball) and artificial surface, equipped with lines, gates, nets, posts, baskets, balls. In addition, the works. mathematicians, nature, language. will be equipped with the help of didact. and ICT-tablice interactive tools, laptops, microscopes, telescopes, visualisers, etc. These aids will make it possible to conduct attractive activities (innovative activities, e.g. robotics, experimental methods, outdoors, ICT, talented students and special needs) to improve the quality and efficiency of education. Objective of the project: improving the availability of infr. schools is consistent with the objective of the priority axis. 7 Efficient public services and actions 7.4. Development of education and training: Improved accessibility of vocational education and schools and will contribute to popular learning and ICT, to raise interest in sport and health, to improve the accessibility of educational establishments. As a result of the project, the potential of infr. support for childcare or educational infrastr. will amount to 3,100 people, supported by 8 infrastr. general education, 1 facility will be tailored to the needs of people with disabilities. The project comes from the Complex. The School Development Plan.