The subject of the project carried out under the ZIT are 3 tasks in the area of Gm. Olsztyn: 1. Task 1: Stage VI Rhinestrade.2- construction of the TRASTORY (to lead along the Łyna z os. Brzeziny to the City Forest and Olsztyn Borders – a route from ul. ul. Tuwima to Central Park. Stage I Witosa – construction of the right-hand road for bicycles and connection of this road with a cycle track from ul. It’s Herder’s. 9 bicycle stands will be set. Stage IVa and IVb Protectors of Tobruk-built right-hand walk-bike line, cycle path and pavement with height adjustment of infrastructure equipment. 2. Task 2: As part of the project "Construction of tertiary roads of Gościnna, Kresowa, Wolodyjowski, Żurawia, erkoza with a section of the road in Gm.Gietrzwald, as a connection of the voivodship road. 527 from DK16-node Olsztyn West" this project includes the construction of bicycle paths and pavements in Kresowa Street from the intersection with the planned Wołodyjowskiego Street to the border of Olsztyn and Jonkowo commune and the construction of sidewalks and paths along the street. Volodyiowski, Crane, Perkoza. 3. Task 3: purchase of 4 tram rolling stock. The most important element of the project is to improve sustainable urban transport by improving the transport conditions of cyclists and pedestrians and public transport passengers. Carrying out tasks in the area of pavements, bicycle paths, lighting, purchase of rolling stock will have a positive impact on the safety of traffic participants and relieves the centre. Annoying communication emissions will be reduced. The existing infrastructure system will be complemented and a coherent and secure transport system of MOF Olsztyn will be created, which transfers the traffic of daily commuting to workplaces, science, etc. The project fits into the assumptions of the SzOOP RPO WiM priority axis 4.Energy efficiency subdivision. 4.4.1 Ecomobile MOF (ZIT Olsztyn), investment priority 4e. Promoting low-carbon strategies.