The project will include. construction of water/channel network with transmission network in Mikosze in the town of Orzysz and san can with pumping stations in Grądy. All the sewage will be sent to the sewage treatment plant in Orzysz. The project consists of 3 investment tasks:Zad 1-Construction of water and sanitary canal to the city beach at Leśna Street in Orzysz with a power pumping plant and internal installation ENN Zad 2 – Construction of water and sanitary canal with sewage pumping stations for the village Mikosze, Zad 3 – building of sewage canal for the town of Grądy. The project will be located: It’s the ass. 1 – on geod. 152/47, 51/8, 161/2, 179, 159/1, 159/4, 160/2 located in Orzysz on Leśna Street, powiat piski, woj.Warmińsko-Mazurskie. Length planned to perform or modern. network can/water approx. 660/932 m (difference results from the length of incorporation into the existing network) 2 – on geod. 49/1, 49/2, 65, 111, 112, 113.114,121,122,129,123,124,213,214/2,214/1,128/1,128/2,125/3,125,5, 49, 3, ー, ー, ー, ー, eu. ed./say/say/d. 2953 m/2 569 m Back. 3 – n° 114/10, 114/2, 138/2, 139/1, 139/9, 199/1, 207/1, 207/4, 209/1, 210/3, 212/3, 213/1, 216/3, 1/1, ー, ー, ー, ー, ー, ⁇, ⁇ for. gravitational approx. 392,4 m, pressured approx. 1231,2 m; home pumping stations (8 pcs), power pumping plant (1 pcs). As part of the project, within the agglomeration there will be approx. 5 km of sanitary network and approx. 3,5 km of water supply. The project fits in. V axis priority. Target tem. 6 Conservation and protection of Wednesdays and support. effect. gosp. resources, the result of the project will be an effective solution. one of the samples. gosp. water/channel and translates to midday state.