As a result of this project, a fully functional road from Klebark Wlk. through Klebark Mały to DK No 16 will be built. The following scope is envisaged: 1. Construction of a district road with a length of 1266.65 m and reconstruction (extension) of road from Klebark Wielki to DK16 with a length of 2973 (road to Klebark Wlk. and bus loop) – total length of the new road 4044 m 4239.65 m 2. Reconstruction of the collision: 3. Construction of the pavement with a length of 1381.1 on the section Klebark Mały – Klebark Wielki 4. Construction of the pavement within the bus loop in Klebark Wielki by a long time. 272.9 m 5. Production of street lighting 6. The infrastructure accompanying the detailed technical description is included in the accompanying design documentation. The technical parameters of the section of the road are determined on the basis of the forecast of users (demand) Phases of project implementation: — submission of an application for funding – signing of a contract for funding – selection of the contractor in accordance with the PHP – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established schedule – promotion of the project – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions set out in the ROP ROP WWM 2014-2020 fulfilling the stated objective: Improving the external accessibility and internal transport coherence of the Municipal Functional Area Olsztyn. The subject of the project is the reconstruction of the local road in the urban functional area of Olsztyn (Mobile MOF). The project is a project on the road from Klebark Wlk. through Klebark Mały to DK No. 16.