Kohesio: discover EU projects in your region

project info
Start date: 11 April 2016
End date: 31 August 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 565 168,86 €
EU contribution: 2 673 876,65 € (75%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Warmińsko-Mazurskiego
beneficiary
European Commission Topic

Construction of a communal road from the district road 1448N through Nikielkowo and Wójtowo to DK 16

The project involves the construction of a fully functional road connecting the municipality of Barczewo with the TEN-T network via DK 16. This road will have a length of 3,1 km in total with the width of the sections: 6 m – long. 1.827 m and 5 m long. It’s 1 feet. In addition, the railway viaduct with the length of 28.08 m, the width of the total structure of 13 m will be rebuilt. This infrastructure, which communicates the Municipality with the overarching road network, will significantly improve the external transport accessibility of the Municipality and its internal coherence. It is intended to handle the traffic of MOF Olsztyn, which will occur after the Olsztyn ring road has been delivered. The road will be handled by personal transport (85 % of passengers), collective transport (15 % of passengers) and commercial transport. The average daily traffic intensity of light vehicles was adopted at the level of 32 volumes/h and heavy vehicles 5 capacity/h. The following range of 1 is expected.Construction of the municipal road with a length of 3.1 km, including the construction of pavements. 2.Reconstruction of the collision: Power grid, telecommunications network, water-channel networks, gas and rainwater networks 3.Decommissioning and construction of a viaduct over railway line No. 353 in the town of Nikielkowo. A detailed technical description is provided in the accompanying design section. Stages of project implementation: —application for DOF. —signing of the DOF agreement. —selection of the contractor in accordance with the PZP -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule – completion of the project and signing of the final protocol -final settlement of the project The project fits into the assumptions set out in SzOOP RPO WWM 2014-2020 fulfilling the stated objective: Improving the availability and internal transport coherence of the Municipal Functional Area Olsztyn. The subject of the project is the construction of a local road in the Barczewo Municipality in the urban functional area of Olsztyn (Mobile MOF) and results from the MOF Strategy including the Strategy of Integrated Territorial Investments.

Flag of Poland  Olsztyński, Poland