The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul.Gościnna, ul Gościnna (Jonkowo), ul. It’s borderline, st. Volodyjowski (Olsztyn). The project covers the construction/reconstruction of roads with a total length of approx. 7.42 km (7.42-value from kilometre), construction of pedestrian and cycle lines, bus bays, intersections, lighting, dehydration, environmental protection devices, greenery, reconstruction of collisions. The project fits into the assumptions set out in the SzOOP RPO WiM by: direct connection of the project line with the TEN-T Comprehensive Network – to which DK16 has been integrated. As a result of the task there will be a homogeneous communication tractor (with convergent parameters) serving the Municipal Functional Area Olsztyn. The road connecting the MOF to the TEN-T network and voivodship road 527 will increase the external accessibility of the area and its internal coherence. Ultimately, the construction of the roads following the implementation of the GDDKiA investment in the construction of the southern ring road Olsztyn in the course of the roads: express S51 and national DK16 will connect directly to the West of the TEN-T network. This will connect part of the MOF to the border crossing in Bezledy and the Olsztyn-Mazury airport. Under the Agreement of 19.04.16, the municipalities jointly carry out the task by Leader-G.Olsztyn and Partners-G.G.Gietrzwald, G.Jonkowo, and will select 1 performer of the study, Inż. Contract and contractor. Each party shall bear the implementation costs corresponding to the size of its part of the project determined on the basis of the tenders of the selected contractors. The leader coordinates the task from signing the agreement, through factual implementation, settlement to durability.