Kohesio: discover EU projects in your region

project info
Start date: 13 March 2018
End date: 30 August 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 679 393,11 €
EU contribution: 1 386 763,26 € (37,69%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji
intervention field

Construction of wind farm (ST5, ST6) in the municipality of Strzałkowo with a capacity of 4 MW (2 x 2 MW) together with infrastructure and power connection.

The planned project consists of the construction of a wind power plant consisting of two ST5 and ST6 wind turbines with a capacity of 2 MW each (4 MW in total) with a maximum height of up to 160 m above sea level, together with accompanying elements (SN power line, control cables and necessary power equipment). Wind farms are part of renewable energy sources. The production process does not use any kind of fuel, only wind energy. The main elements of the installation are a rotor, which converts wind energy into mechanical energy and a current generator placed in the gondola, which converts mechanical energy into electrical energy. The change of energy is due to the phenomenon of electromagnetic induction. The power plant is the resultant wind power at its location, and the construction of the power plant. One of the main factors in each country’s economy is energy security. This expression should be understood as the state of the economy enabling consumers to meet current and prospective fuel and energy needs in a technically and economically justified manner, while respecting environmental requirements. The construction of such a power plant supports this operation and also increases the level of production of renewable energy sources, which effectively supports the transition of the Polish economy to low carbon. Purchase of services and building materials necessary for the construction of access roads and assembly sites, foundations for turbine towers, as well as power connection, cable line SN, grounding and container measuring station.2. Purchase of fixed assets in the form of complete electrical and energy equipment necessary for converting wind energy into electricity – wind turbines.3. Having an authorised investor supervision inspectorThe project effects will be:Number of built electricity generation units from RES – 2Number of enterprises receiving support – 1.

Flag of Poland  Koniński, Poland