Kohesio: discover EU projects in your region

project info
Start date: 8 June 2018
End date: 4 March 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 277 917,02 €
EU contribution: 236 229,47 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

“Termomodernisation of public buildings in Buk City and Municipality with the assembly of renewable energy sources”

The project includes thermo-modernisation of 5 public buildings in the City and Buk Municipality.School podst. Szewce and her Filia school subst. Dakowy Sucheoba detached buildings, 2-storey. partially cellar.School podst. A freestanding building, 2-storey. completely cellar. from the school.–Przedszk. Niepruszewo is: 3rd floor building, partly cellar.,-building with 2 floors terrestrial, completely sub-terrestrial.-1 floors unreliable.Buildings in BukMiejsko-Gminny Centrum Kultury3-storey subditinged. The energy audit (ex-ante) that the buildings do not meet the requirements of the maximum value of the seasonal heat demand for heating in the standard heating season, the outer partitions have a low thermal insulation value [454.2-0) [2.2-200] [2.200-200] [2.200-200] [454.2-0) [2.2-200] [2.200-200] [2.200] [454-2] [454.2-0] [1.2-200] [200.2-200] [2.200] [454.2-0] [2.200-200] [2.200-2] [2.200] [1.454-2] [2.200-200] [2.200-200] [2.200] [454-2] [454-2] [0.457 in 2] [2.200-200] [2.200] [2.200] [2.200] [454-2] [454.2-2] [1.454-2] [2.200-2] [2.200] [1.454-2] [1.454-2] [200.2.200] [2.200] [2.200] [2.200-2] [2.200-2] [200.2-1] [2.2-200] [2.200-2] [2.200-2] [2.200] [454.2-2] [1.454-2] [1.454-2] [2.200] [2.200] [2.200] [2.200] [2.200] [2.200] [2.200] [2.200] [2.200] [454.2-0] [2.200] [2.200] [2.200] [454.2-200] [454.2-2] [2.200] [454-2] [2.200] [454.2-2] [1.454-2] [1.454-2] [200.2.200] [1.454-2] [1.454-2] [1.454-2] [1.454-2] [1.454-2.200] [2.200-2.1) [2.2-200] [2.2.200] [2.2-200] [2.200] [2.200-200] [454.2-200] [454.2-200] [2.200] [2.200 in 2.200] [454.2-200] [454.2-200] [454.2-2] [1.2.2] [1-2] [1-2] [1.2] [1-2] [1-2] [1-454] [454.2-2] [200.2.2] [200.2-2] [2.200] [454.2-200] [1.2.200] [454.2-2] [1.2.2] [1.2.2] [1.2.2] [2.200] [454.2.-200] [2.2] [1.2-200] [454.2.-200] [454.2.200] [2.200] [2.200] [2.2-200] [2.2.200] [2.2.200] [2.2.200] [2.200] [2.200] [2.2.200] [2.2.200] [2.2.200] [2.2.200] [1.454] [454.2-200] [1.2] [1-2] [1] [454-2] [2.200](454)(1) [454 3.500 [W/m2K]- windows 3.000 [W/m2K]2. The school-preschool team in Niepruszewo- the walls of the cavity. 1.135 [W/m2K]- roof of the gym 0.314 [W/m2K]- ventilators. 0.251 [W/m2K], non-ventilal. 0.412 [W/m2K]- windows 3.120 [W/m2K]3. Local-Gmina Cultural Centre in Buku – outside walls. 1.42 [W/m2K]- walls on the ground 1,50 [W/m2K]- roof 0,57 [W/m2K]- windows 1.8 [W/m2K]Product indicators:number of energy upgraded buildings 5 units of built heat generation units from RES 5 units Used surfaces of buildings undergoing thermal modernisation 5615.51 m²

Flag of Poland  Poznański, Poland