Kohesio: discover EU projects in your region

project info
Start date: 29 December 2014
End date: 31 January 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 607 943,69 €
EU contribution: 1 366 752,13 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

Increase the integration of different modes of transport and improve access to public transport in Tarnowo Podgórne municipality through investments in transport infrastructure and purchase of bus rolling stock

The project consists of complex components that improve the quality of urban transport:1. Purchase of 4 low-floor buses 12 m EURO 6 equipped with passenger information boards and gates counting passengers, with a total of 368 passenger seats and equipment of the operator’s rolling stock with line number.2. The creation of 2 integrated interchanges-covered stop shelters for a total of 40 people, including covered car parks bikeamp;ride with a total of 20 seats for bicycles. A total of 4 innovative passenger information boards will be erected within the centres. The centres will handle transport within the commune, as well as connections to Poznań and new ones with the railway station in Rokietnica.3. Creation of a new bus line Terma-Rokietnica PKP (for residents of the commune-fast access to the railway; on the other hand – access to workplaces, services,etc) and the creation of a new Junkowo-Garde line running through Przeźmierowo (the total length of new lines is 26.248 km). The setting up of the line will reduce traffic and reduce CO2 emissions.4. Construction of a foot-bike path along the street. The forest is about km long. 542 m – the missing element of the cycle, access to the interchange centre in Przeźmierów from settlements located in the area. 5. Reconstruction of St. Ecclesiastical in Przemierowa over a length of 592 m. improves safety and access to the planned interchange centre. As part of the reconstruction, the PAMP;R facility was also created for 68 parking spaces. As part of the parking lot, 1 space for the disabled.6. Reconstruction of St. On 25 January in Tarnów Podgórny over a length of 389 m, improving safety and access to the planned interchange centre. As part of the reconstruction, PAMP;R car park was also created with the possibility of parking 17 cars. The total number of parking spaces will be 85.6. Information and promotion campaign in the municipality to promote public transport.

Flag of Poland  Poznański, Poland