Kohesio: discover EU projects in your region

project info
Start date: 1 June 2016
End date: 6 September 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 900 620,18 €
EU contribution: 1 849 145,36 € (63,75%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji
intervention field
beneficiary

Construction of a sanitary system in Brenno

Project Mon. “Construction of sewage system in Brenno” will be carried out in the area of the Wijewo agglomeration, in the Leszno County, Wielkopolska Voivodeship. The project is designed to equip the site with technical infrastructure, enabling the collection of sewage from the Brenna area and discharge to the sewage treatment plant in Wijewo.As regards this project, the construction of a sewage system in a vacuum system with a total length of 8982.73 m is envisaged. In private areas, it is planned to locate collective home wells to which sewage from buildings will be discharged: mobile wells – 144 pieces, impassable wells – 165 pieces, as wells as construction of network fragments in a vacuum system, draining sewage to main pipelines (channels). The project envisages, among other things:-channels – 5664.71 m-gravity channels – 6,38 m-collective valve wells – 309 units-collective household wells – 23 pcs-total number of wells/channels – 332 pcs. The final beneficiary of the project requested for funding under the PSF is the municipality of Wijewo, located in the district of Leszno. The final beneficiaries to whom this project is addressed will be all residents of the municipality, for whom the implementation of the investment will mean improving the environment, increasing investment opportunities by arming new sites into a sewage network and developing rural areas of the municipality. Ultimately, the beneficiaries will also be residents of the region around Lake Brenski, Lake White, Lake Miłka, as well as residents of the region through which the river Chernica flows.Product ratio achieved as a result of the project in 2018:- Length of built sanitary sewage system, km, Final receipt protocol, invoice – 14.65 km

Flag of Poland  Leszczyński, Poland