Project Mon. “Construction of sanitary sewage system in the village of Needo” will be carried out in the Wijewo agglomeration, in the district of Leszno, Wielkopolskie Voivodeship.The project is to equip the area with technical infrastructure, enabling the reception of sewage from the area of need and discharge to the sewage treatment plants in Wijewo.In the scope of the project, the construction of sanitary sewage system in a vacuum system of a total length of 6680.5 m will be provided. mobile wells – 34 pieces, impassable wells – 51 pieces, as wells as construction of network fragments in a vacuum system, draining sewage to main pipelines (channels). The project envisages, among other things:- sewerage canals – 591 m- gravitational channels – 3 m- the total number of wells/canals – 85 pieces The final beneficiary of the project requested for funding under the WRPO is the municipality Wijewo, located in the district of Leszno.The final beneficiaries of the project, to which this project is addressed, will be all residents of the commune, for whom the implementation of the investment will mean improvement of the natural environment, and the increase of investment opportunities. Ultimately, the beneficiaries will also be residents of the region through which the river Chernica flows (Odra water catchment).Product ratio achieved as a result of the project in 2020:- Length of built sanitary sewage system – 7.274 km