Start date: 15 October 2018
End date: 6 July 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 6 557 957,02 €
EU contribution: 5 574 263,46 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

Extension of the Voivodeship Road No. 123 of Huta Szklana – national road no. 22 (Przesieki) on the section from the end of the built-up area of Kuźnica Żelichowska to the intersection with the national road no. 22 (Przesieki)

The subject of the investment is the extension project of the Voivodeship Road No. 123 Huta Szklana – DK 22 (Przesieki) on the section from Kuźnica Żelichowska to the intersection with the national road no. 22 (Przesieki). The scope of road works related to the extension of the voivodship road to technical parameters of class G includes the correction of the route in the plan, the execution of the main road with bituminous surface and the surface structure provided for the KR3 traffic load with a cross-section road, two-lane. The technical parameters of the road were adopted for design speed of 50 km/h and a 70 km/h speed. A road with a width of 6.0 m was designed. The roadway on this section is designed in a road section with a 2.00 m width reinforced with non-binding mixture 0/31,5 mm (thickness of 17 cm).As part of the extension, the following tasks are to be carried out:• the correction of the geometry of the route in the plan and in the longitudinal section,• the extension of the roadway to the existing roadways to the normative width (from 3,50 m to 6,00 m), • execution of a new structure on the pavement and the roadway,• the performance of the new roadways to the normative widths (from 3,50 m to 6,00 m), • execution of a new structure on the roadways and roadways,• performance of the new lining of the roadways, assembling of the existing line (from 3,50 m to 6,00 m), a new construction of the pavement and the roadway, assembling the new line, is carried out in the roadways. Length of reconstructed voivodship roads: 8,254 km/year 2021. Number of road engineering structures built or reconstructed 3 pieces. /Yeah, 2021

Flag of Poland  Pilski, Poland