The planned project consists of the construction of the Wronek ring road within DW 182 and 184. The aim of the construction of the ring road is to increase competitiveness and ensure social, economic and spatial cohesion in order to increase the attractiveness of the Wielkopolska voivodship as a place to invest, work and live. As part of the investment, it is necessary to build a bridge over the river. Watch, which will allow for heavy traffic from the centre of Wronki. road with the parameters of the “G” road, wide. 7 m, with a wide side. 2 m, KR5, 115 kN/axle. Surface: SMA abrasive layer of 4 cm. Locally there will be curbs, concrete sewage and pavements from concrete cube or bituminous walkways (near the intersections of existing buildings).The investment includes the construction of 3 engineering facilities:1. Bridge over the Warta RiverBlack bridge, three-word bridge. Compressed concrete construction. Single-chamber box beam with variable height. Supports on stakes. It’s the integral. 252.20 m, wide integral. 15.3-15.62 m, wide foot-bike lines 2x2.0 m². Overpass over the railway line. ~ 80.70 m, wide integral of the bridge of 14.20 m, width of walking-bike lines 2x2.0 m³. Overpass over the road to m. GuardiansThe structure of the lifting system closed with corrugated sheets, total length ~ 42.70 m, wide roadway 8.0 m, wide foot-bike lines 2x2.0 m.The objectives of the project will improve the quality and living conditions of the target groups of the project, which include people at risk of exclusion (older, disabled, unemployed). A lasting effect like an extended voivodship road will serve all users, including people with disabilities. El. roads will have no architectural barriers that hinder the movement of people with disabilities.Length of built voivodship roads: 5,169 km/year 2022Number of built bypasses: 1 pcs/year 2022Number of built or reconstructed road engineering structures 3 pcs/year 2022