Start date: 21 August 2018
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 30 456 868,00 €
EU contribution: 28 324 886,00 € (93%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

Construction of the Gostynia ring road within voivodship road No. 434

The planned investment will consist of the construction of the circuit. Gostynia within DW 434 and for the section 6.614 km will be implemented in the formula “Z+B”. As part of the construction of the circuit, a section of length will be made. 1.832 km connecting the circuit to the existing DW 434 in Gostyń – the construction of the section in the “build” formula.The oblast consists of the construction of roads with hard surface and 6.614 km length, together with road engineering facilities as well as equipment and associated installations. Zlokali. will be on the east side of the city of Gostyń. Within the framework of road engineering facilities will be e.g.: — bridge over the river Stara Kania (km 4 + 712,30); — overpass over the railway line No. 360 Jarocin – Leszno (km 4 + 958,63); — viaduct over national road No 12 (DK12) (km 5 + 034.03). Parameters: the way of the heads. (G), quickly. project. 60 km/h, wide road: 7 m (2 x 3.5 m), wide side: 2 m, traffic category: KR5, loads: 115 kN/axle, abrasive layer: SMA with a thickness of 4 cm.As part of the construction of the area, binding the area with the existing DW 434 in Gostyń.The construction of a road with bituminous pavement – width of 7.0 m and a path on foot with bituminous surface – 2.5 m wide. Dehydration will be done by means of road ditches and rain drainage. incorporated into an existing network located at ul. It’s over Kania. The project will strengthen the side with a natural aggregate.Construction of the new road system during DW 434 is of strategic importance for improving traffic conditions and further development of the region: it will provide a convenient intra-regional connection, create a favourable connection between the region and the network of higher roads (including S5,S11 and DK12), facilitate tourist and road traffic.Length of built voivodship roads: 1,832 km/r 2019, 6,614 km/r 2021Number of built bypasses 1 pcs/year 2021Number of built or reconstructed road engineering structures 7 pieces. /year 2021Number of built or reconstructed junctions 9 pcs year 2021

Flag of Poland  Leszczyński, Poland