Kohesio: discover EU projects in your region

project info
Start date: 1 January 2014
End date: 30 November 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 12 814 787,81 €
EU contribution: 8 824 262,88 € (68,86%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

Reconstruction of St. Gdyńska (DW 196) from the junction with ul. Baltic to the border of the city.

The subject of the project is the reconstruction of Voivodeship No. 196 in Poznań (ul. Gdyńska) at odc. to ul. The total extension of the dr. length is 1.450 km (0 + 428.21 to 1 + 929.58 km), dr. access to ITPOK from 0 + 000 to 0 + 443.60 km, length of Dr. distributing No 1 from 0 + 000 to 0 + 840,38 km, dr. dr. In addition, the project plans to build 5 bridge structures: tunnel T-1 for pedestrians and cyclists under ul. Gdyńska, tunnels T-2a and T-2b under ul. Gdyńska along the route no. 1 and railway line No 356, tunnel T-3 under ul. Gdynia along the route no. 2, tunnel T-4 for pedestrians and cyclists. Wider section III.1 SW.The total length of new facilities inż. is 0.221 km. open intersection with ul. Chemical, road building access. and traffic distribution in the area of the node "ul. Gdyńska-cross. with railway line no. 356" construction of the access road to ITPOK, construction of bus bays, sidewalks, bicycle roads and walkways., road-free devices (e.g. protection barriers, cross-road crossings, markings, bus bays, traffic signalling), rainwater canal, dr. lighting, technological channel, reconstruction or security of all collisions with public equipment, construction of individual and foreign equipment The project is implemented in one step. Within the eligibility costs, the project can distinguish: study wy, part of the amount for compensation for land acquired, construction works and materials and promotion. Ineligible costs are: project documentation, part of the compensation for the land seized, vat from the rain canal, engineer coordinator and author supervision.

Flag of Poland  Miasto Poznań, Poland