Kohesio: discover EU projects in your region

project info
Start date: 8 May 2018
End date: 10 July 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 455 639,97 €
EU contribution: 1 237 293,97 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji
intervention field

“Construction of a stationary hospice with a care and treatment facility, internal roads and parking spaces and planting of insulating green on plot no. 178 at ul. Royal 8 in Pile”

The planned construction of the Hospice together with the Care and Medical Centre in Pile meets the need for a centre where chronically ill patients will be able to find professional, stationary care. It is planned to build the facility on 40 beds, including 30 beds will have medical care status and 10 hospice beds: for adults and children. The aim of the project is to provide the elderly, disabled and need constant care of a place in the Hospice near the place of residence and to ensure the healing continuity carried out so far by the Applicant in the Paliat Care Clinic of the Domestic Hospice.The area on which the location of the building is designed is located in the north part of the town of Piła on the outskirts of the housing estate K3 (“Nad Zalewem”). The investment includes the construction of a ground-floor, ground-floor building with a steep roof, not subterranean. The basic supporting elements are brick walls, prefabricated ceilings and carat beams. These elements carry vertical loads from own weight, utility loads, wind and snow. Traditional technology has been adopted, partly prefabricated (L-19, ceiling slabs). The ceiling was selected taking into account the characteristic utility load of 3,0 kN/m² and a replacement load from the partition walls of 1,25 KN/m². The roof was designed with snow and wind loads. The project includes solutions necessary for the use of the building by disabled persons.IndicatorsNumber of medical entities supported by 1 pcsNumber of facilities to suit the needs of people with disabilities 1 pcsInvestment expenditure on the purchase of medical equipment – 587 883.42 PLNNumber of purchased fixed assets – 409 unitsEmployment in supported entities (including companies) 16.75 EPCLicz. people using health care facilities covered by 500

Flag of Poland  Pilski, Poland