The project involves the conversion of the existing building into practical study studios (according to the standards in the vocational training programmes) and the addition of social facilities and boiler room. The task envisages the execution of: — reconstruction (adaptation) of a part of the garage shed for practical classrooms, including: construction of reinforced concrete structures and walls, replacement of ceilings and roofs and finishing works; — the addition of social premises and boiler rooms; — electrical, sanitary and central heating installations. The final stage will be to equip the facility with the necessary technical equipment, equipment and assistance for practical apprenticeships and examinations (i.e.: machinery, equipment, apparatus, measuring instruments, tools, power tools and other professional equipment). As part of the project, workshops will also be retrofitted, where vocational training has been conducted in the School Complex so far. As a result of the reconstruction, the school will receive rooms providing a concentration of practical training courses and examinations in a single functional, well-decorated and equipped with modern training facilities. The building will have: occupational workshops, b) social-educational workshop, c) storage room (with possibility of presentation of the construction and operation of machinery), (d) administrative, economic, social, sanitary and boiler rooms. The building will also provide the necessary conditions for disabled people, especially wheelchair users, as part of the project. As a result of the project, the following output indicators will be achieved in 2018: — Number of supported vocational training facilities – 1 pieces. — Potential of supported childcare infrastructure or educational infrastructure – 500 people