The aim of the project is to build a two-way bicycle road on a street. Station in Białogard. The applicant plans to implement the project in the “design and build” system. It will therefore start by drawing up project documentation to allow the applicant to carry out the investment. The construction works will then be carried out, resulting in a 0.33 km long bicycle road. The project will result in a reduction of CO2 emissions to the atmosphere of 0.0541 Mg. The entirety will be supervised by the engineer of the contract. Bicycle roads provide an excellent alternative to individual car transport. The route planned for construction as part of the project will complement the existing network of bicycle roads in the city, namely connect the street. May 1st with the train station. Thanks to the new bicycle route, residents will be given the possibility of safe and non-committal access from the connecting centre to the city centre. The planned bicycle route will influence the choice of this mode of transport during the arrival of Białogard to work or school. A coherent network of roads for bicycles in the communes of Kołobrzesko-Kołobrzesko-Białagarde Functional Area guarantees safe access of residents to workplaces, schools or public institutions, using the most ecological means of transport. This will undoubtedly reduce emissions of pollutants into the atmosphere and reduce the number of transport accidents involving cyclists in the KKBOF. The implementation of the project will contribute to the development of infrastructure promoting green transport and will increase the level of safety and traffic flow.