The applicant of the project is the West Pomeranian Centre oncology in Szczecin – a hospital whose body is the Management Board of Zachodniopomorskie Voivodship. Investment planned by the Applicant “the construction of a photovoltaic power plant, together with electricity connections, will be located on the property designated as a landmark no. 32/8, perimeter 3089, for which the District Court of Szczecin Prawbrzeże and West Szczecin is separated and maintained by the perpetual book no. SZ1S/00111508/4. The project will be the construction of two photovoltaic power plants technically and technologically independent, with a capacity of 399.84 kW and 18,36 kW, consisting of a source of solar radiation to electricity, technological and technological equipment converting generated electricity to the performance parameters of energy consumers, cable lines for the transmission of generated energy and technical infrastructure associated with operation, technical supervision of the power plant and security and safety. The electricity generated in this way will be used for the hospital’s own needs. The roots of the problem to be solved are the rising costs of electricity used by the Hospital for daily activities in recent years. In the last few years, the West Pomeranian Oncology Centre in Szczecin has completed a number of construction and retrofit investments in the hospital. New buildings were built, where new hospital wards were located, as well as investments in medical equipment (new magnetic resonance imaging, tomograph). All these activities have led to a significant increase in the costs of providing the electricity necessary for the operation of new medical equipment or lighting of new premises created within the hospital’s infrastructure. The construction of two photovoltaic power plants will contribute