Start date: 7 March 2016
End date: 31 December 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 288 796,68 €
EU contribution: 245 477,17 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski

Improving the state of the urban environment through the construction of networks and sewers of rainwater drainage and drainage in ul. Wiślana, Patrycy, B. Śmiała, B. Krzywoustego, W. Jagiełła, Mickiewicz and Dąbrowszczaków in Białogard

The aim of the project is to improve the state of the urban environment through the construction of networks and sewers of rainwater drainage and drainage in ul. Wiślana, Patrycy, B. Śmiała, B. Krzywoustego, W. Jagiełła, Mickiewicz and Dąbrowszczaków in Białogard. The scope of the works includes the construction of a network of drainage drains from rain drains through the drainage drainage system through wells to the rainwater drainage network in the street. Wiślana, Patrycego, B. Krzywoustego, W. Jagiełła, Mickiewicz and their inclusion in the existing network in ul. B. Brave and Dąbrowszczaki. The project also includes the construction of a sewage drainage network from drainage ditches to the newly built rainwater drainage network in ul. Vistula in Białogard. Project scope:As part of the project, the following number of main sewerage networks is planned: o500 PVC – 141 m, o400 PVC – 237 m, o315 PVC – 1928.8 m and wells: it’s 1,2-bet. — 105pcs, o1,4bet. — 11 pieces and tubular: o315 PVC – 23.8 m, o200 PVC – 179.9 m, well by 1.2 m bet. — 1 pieces, 0.5 m with settler – 52 pieces, drainage: o160 PVC – 18.4 m, drain pipe – o126 PVC – 301.7 m, wells about 315PVC – 12pcs. The total length of the rainwater drainage system that is planned to be built is 2.8306 km. The total number of inhabitants using this system will amount to about 450 people. An external investor supervision (contract engineer) is expected to be commissioned, which will include conducting investor supervision of works by professional works inspectors. Its promotion will also be carried out as part of the project. In view of the above, the following tasks can be assigned in the project: 1. design documentation; 2. construction work; 3. Promotion of the project; 4. Contract Engineer. The new infrastructure will be permanently installed in the ground – the project belongs to a group of fixed projects.

Flag of Poland  Koszaliński, Poland