The subject of the investment is the reconstruction and expansion of the voivodship road on the section Trzebiatów – Płoty divided by two parts of Trzebiatów – Gryfice from km 11+ 197(exit from Trzebiatow, the end of works RPO 2007-2013) to km 26+ 333,65(inactive railway siding in Gryfice) and Gryfice – Płoty from km 27 + 997.20(exit from Gryfic area of intersection with ul. Starogrodzka) to km 37 + 637,76 (a link to the inlet made in previous years to Płota). Total length. — OK. It’s 24,78 miles. Road with the parameters of the main class “G” road and the proposed traffic category KR3 and KR4. The scope of construction works includes:- harmonising the width of the road and regulation of sideways;-strengthening the structure of the pavement to the established parameters;- introduction of tranquilising elements on the inlets to the village;- correction of arches taking into account the improvement of flow flow and visibility, making left-turns at crossroads constructions requiring improvement with the possibility of introducing new bays;- regulation of pedestrian traffic in the area of crossings and ordering of pedestrian traffic in existing towns through reconstructions of new bays;- regulation of pedestrian traffic in the area of crossroads and ordering of pedestrian traffic in existing towns by reconstruction of the existing canals; — renovation and reconstruction of existing culverts under the watercourses and between the two-sided ditches;- reconstruction of existing lighting in Kłodkowo, Górzyca and Gryfice towns with its expansion and lighting construction in places required by applicable regulations;-repair of the bridge over the Otoczka river.