The subject of the project is the reconstruction of ul. Port and Kościuszko in Stepnica with a total length of 593.97 m. The project involves carrying out the following works: demolition and preparatory works and post-executive inventory; earthworks, dehydration of the road body; substructures; surfaces; traffic safety devices; elements of streets; road green; dismantling of 0,4 kV grids and connections and street lighting, construction of 0,4 kV power grids; construction of 0,4 kV power connections; rain drainage-pressure pipe; gravity rainwater drainage; storage tank ZB-1; rainwater cleaning system.