The aim of the project is to introduce several measures contributing to the permanent saving of final energy consumption of the production company Strojírny Prostějov, a.s. and to reduce CO2 production, namely insulation of the perimeter shell and roofs, replacement of holes, modernisation of the heating system including installation of new boilers and low temperature infrared heaters, modernisation of lighting, air filtration, installation of photovoltaics and waste heat from the blasting chambers.