Construction of a new substation in order to increase transmission capacity, increase the security and reliability of the transmission system of the Czech Republic in the Ústecký, Karlovy Vary and Pilsen Region areas in connection with the intention to build new energy sources at the level of the distribution and transmission system and to strengthen the connectability of renewable sources and applicants for connection. a.