In connection with the planned construction of the 3rd and 4th block of Temelín NPP, the purpose of the event is to strengthen the links of the transformer Havlíčkův Brod Mírovka to the transmission system of the Czech Republic and to ensure the overall transmission capability and reliability of the transmission system.