THE PRESENT PROJECT WILL COVER THE CONSTRUCTION OF A NEW 380150KV POWER STATION IN GARAGUSO (MT) TO BE INCLUDED IN THE ENTRY — EXITING THE EXISTING ELECTRICITY STATION LARINO — ALIANO, FUNCTIONAL TO THE INCREASE IN ENERGY FED INTO THE GRID BY RES INSTALLATIONS, AND FOR WHICH THE CONGESTION FROM THOSE PLANTS INVOLVES THE IMPOSSIBLE TO EVACUATE THE ENERGY FROM BOTH THE GD AND THE INSTALLATIONS DIRECTLY LINKED TO THE NETWORK IN QUESTION, EVEN IF THE DISTRIBUTOR HAS REQUESTED THE CONNECTION OF A FUTURE PRIMARY CABIN TO ALLOW NEW QUOTES FROM RENEWABLE SOURCES TO BE PLACED ON THE NETWORK FOR A TOTAL OF 80 MW IN STORAGE. THE REQUEST BY THE DISTRIBUTOR TO TERNA OF A SOLUTION TO RTN IS THE RESULT OF THE DISTRIBUTOR’S NEW POWER FROM RES ON THE MTBT NETWORK. IN ADDITION, THE INTRODUCTION OF THE NEW SYSTEM IS NECESSARY TO ALLOW THE INTRODUCTION OF THE ELECTRIC NETWORK.