THE MEASURES WHICH MAKE UP THIS PROJECT CONSIST OF THE IMPLEMENTATION OF ‘SMART FUTURE TRANSMISSION SYSTEM’ THROUGH THE INSTALLATION OF INNOVATIVE HIGH TEMPERATURE CONDUCTORS WHICH WILL: INCREASING THE CAPACITY TO TRANSMIT, FROM ONE POINT TO THE OTHER OF THE TRANSMISSION NETWORK ITSELF AND BETWEEN THE TRANSMISSION NETWORK AND THE DISTRIBUTION NETWORKS, ALL THE INFORMATION THAT IS ESSENTIAL FOR THE ACTIVE MANAGEMENT OF THE ELECTRICITY SYSTEM AND DISPATCHING NETWORKS TO PREVENT THE FORMATION OF BOTTLENECKS IN THE INTERCONNECTIONS BETWEEN THE TRANSMISSION NETWORKS AND THE DISTRIBUTION NETWORKS, OPTIMISING THE TRANSPORT OF ELECTRICITY SO AS TO ALLOW BETTER USE OF THE EXISTING ELECTRICITY TRANSMISSION CAPACITY OF THE EXISTING ELECTRICITY LINES, WHILE CONTINUING TO OPERATE THE NETWORK SAFELY. INCREASING THE NETWORK’S CAPACITY TO ABSORB A MAY